Executive Summary (TL;DR)
- Light deprivation (light-dep) uses blackout coverings and scheduling to shorten daylength, push cannabis into flower, and stack multiple outdoor/mixed-light harvests per season.
- The winning formula is: tight blackout + stable climate at “lights-out” + disciplined fertigation. Pair VPD-aware airflow with leak-free curtains and you’ll protect resin, weight, and grade.
- Build your plan around regulatory fit first (zoning, buffers, CEQA, water and wildlife rules). If timelines are tight, acquire a permitted greenhouse or operating license and retrofit your SOPs. → Browse greenhouses for sale
- The guide below covers photoperiod science, blackout systems, timing templates, climate control at lights-out, and a Triangle-ready due-diligence checklist you can lift straight into your business plan.
Table of Contents
- Light-dep in one page
- Photoperiod, PPFD, and DLI—why timing works
- Blackout systems: options, tradeoffs, and design notes
- Scheduling & crop timing (playbooks and tables)
- Climate at lights-out: VPD, fans, and dehumidification
- Fertigation & IPM adjustments for light-dep
- Yield math, labor, and KPI dashboard
- Siting & permitting (zoning, buffers, CEQA, water/wildlife)
- Build vs. buy (decision table)
- Due-diligence checklist
- Next steps and curated inventory
Light-dep in one page
What it is: In mixed-light or outdoor hoop houses, light deprivation applies opaque covers (blackout curtains or tarps) to mimic short days, initiating and maintaining flowering on your schedule. That unlocks 2–3+ runs per outdoor season, smoother labor utilization, and better shoulder-season quality.
Why it works: Cannabis is a photoperiod-sensitive crop—most cultivars flower reliably when the daily light interval drops below a threshold. The historical shorthand is 12 hours dark, but modern work shows some lines flower at photoperiods slightly longer than 12 h; timing remains cultivar-dependent. PMC+1MDPI
What makes it fail: Light leaks, humidity spikes during blackout, and sloppy scheduling. If “lights-out” is damp, you invite Botrytis; if curtains leak, you re-veg or stall.
Photoperiod, PPFD, and DLI—why timing works
- Photoperiod = the light/dark cycle that drives flowering signals. Many drug-type cultivars initiate strongly near 12 h dark; others tolerate >12 h light while still flowering (assay-verified). PMC+1
- PPFD (Photosynthetic Photon Flux Density) measures incident photons (400–700 nm) per m² per second; it’s the instantaneous light at canopy. PPFD is defined for horticulture in ANSI/ASABE S640 and by the DesignLights Consortium (DLC). DesignLightsGrowFlux
- DLI (Daily Light Integral) is the sum of PPFD over the day (mol·m⁻²·d⁻¹). Greenhouse research shows many crops “finish” well when the DLI meets a minimum threshold; for finish stages, ≥10–12 mol·m⁻²·d⁻¹ is a common baseline in floriculture literature (cannabis targets are typically higher for premium flower quality). Purdue ExtensionAg & Natural Resources College
Implication for light-dep: When you shorten daylength, protect total energy by running high PPFD in the on-hours and keeping canopies cool/oxygenated during blackout. Mixed-light houses often supplement with LEDs to keep DLI on target during shoulder seasons.
Blackout systems: options, tradeoffs, and design notes
Component | Options | Pros | Watch-outs |
---|---|---|---|
Curtain type | Interior truss-hung energy/blackout curtain; exterior roll-over tarp | Interior is protected from wind; exterior gives darker result in simple hoops | Interior needs tight perimeter seals; exterior needs wind-rated hardware |
Layers | Single blackout; double (black + energy) | Double cuts radiant heat at night; reduces sky-glow | Higher capex; more moving parts |
Drive | Manual winch, line-shaft, or rack-and-pinion automation | Automation enables precise schedules and alarms | Manual = labor bottlenecks; schedule drift = yield/quality loss |
End-wall seals | Brush seals, magnets, overlap flaps | Protects from leaks | Poor sealing = re-veg/stress |
Controls | Standalone timer vs. integrated climate controller (links to fans/vents/heat/Dehu/CO₂) | Integrated control avoids humidity spikes | Timers alone ignore VPD; risk of condensation |
Monitoring | Light sensors and leak test during blackout | Catches failure fast | No sensors = invisible drift |
Design notes:
- Size fans for air exchanges during blackout (circulation + limited fresh air without light leaks).
- Provide manual override and alarmed failure mode (curtain open) to prevent heat buildup.
- In windy sites, exterior covers need reinforced roll tubes and lock-down straps.
Scheduling & crop timing (playbooks and tables)
A) Classic 12/12 playbook (photoperiod flower)
Step | Action | Notes |
---|---|---|
Week 0 | Last veg push; lollipop as needed | Avoid heavy stripping after Day 7 flower |
Day 0 | Start 12 h light / 12 h blackout | Cover at the same clock time daily |
Days 1–10 | Hold strict schedule | No leaks; no missed days |
Day 14 | Confirm pistils/calyx development | If slow, verify leaks and DLI |
Weeks 3–7+ | Maintain VPD, dehu, and airflow | Adjust feed EC to cultivar |
Note: some genetics tolerate >12 h light during flower while maintaining reproductive signaling; if you trial longer on-hours to raise DLI, do it in split tests and watch for re-veg risk. PMCMDPI
B) Multi-harvest seasonal templates (temperate climate)
Run | Veg period | Blackout start | Harvest window | Remarks |
---|---|---|---|---|
Spring dep | 2–3 weeks | Late Apr–May 1 | Late Jun–Jul | Cool nights help resin; watch Botrytis in late rains |
Mid-summer dep | 10–14 days | Late Jun–Jul | Aug | Warm VPD; watch heat at blackout |
Late dep | Short veg | Early Aug | Sep–Oct | Build DLI with supplements; remove cover during day to vent |
Operational safeguards
- Maintain a curtain log (open/close times, operator initials).
- Add redundant alarms (missed close, power fail).
- “Leak patrol” is a job: walk the perimeter during blackout in minimal light, checking end-walls and gables.
Climate at lights-out: VPD, fans, and dehumidification
VPD (Vapor Pressure Deficit) indicates the air’s “drying power” and predicts transpiration better than RH alone. Greenhouse extension guidance recommends maintaining VPD >0.5 kPa when finishing dense canopies to reduce disease risk. Ag & Natural Resources College
Target pattern
- At curtain close, stage circulation fans and Dehu so RH doesn’t spike.
- Use perimeter air knives or filtered louver intakes with light-traps to mix a small volume of cool, dry air without leaks.
- Keep leaf surfaces dry; films of water plus darkness = pathogen party.
- During shoulder seasons, pre-dry for 10–15 minutes before curtain close.
Sensors
- Put temp/RH probes at canopy height in multiple bays; log VPD uptime (% hours in target).
- Install a low-cost lux sensor inside the blackout zone to alert for leaks.
Fertigation & IPM adjustments for light-dep
- DLI-aware feed: If daylength shortens without supplemental PPFD, consider slight EC reductions to match lower carbohydrate demand and avoid oversalting.
- Runoff discipline: Track feed vs. drain EC/pH daily; keep 10–20% runoff in coco/rockwool to prevent salt creep during hot blackout days.
- Root-zone oxygen: Short, frequent pulses during “lights on” protect oxygen and stabilize EC; avoid heavy irrigations immediately before blackout.
- IPM: Blackout raises leaf wetness risk. Prioritize canopy spacing, leaf removal timing (not inside blackout), and biologicals compatible with your harvest window.
Yield math, labor, and KPI dashboard
Yield math
- Light-dep increases turns per season; even if single-run yield is slightly lower than full-season outdoor, annualized output often rises and grade distribution improves (earlier harvest avoids fall storms).
- The premium comes from quality timing: spring and mid-summer deps command better nose and bag appeal than rain-risk October.
Labor
- Blackout is a daily, time-critical task. Automation cuts misses; manual crews require shift discipline.
- Harvests cluster; stagger bays by 1–2 weeks.
Weekly KPIs
- Curtain compliance (misses/week, alarm events)
- VPD uptime during blackout; RH spike magnitude at curtain close
- Feed vs. drain EC/pH; runoff %
- DLI by bay; supplemental hours used
- PM/Botrytis incidence; active CAPA tickets
- Grade distribution and COA pass rate
Siting & permitting (zoning, buffers, CEQA, water/wildlife)
Light-dep is often the least forgiving of siting mistakes because neighbors notice covers and night lighting, and CEQA reviewers look closely at sky-glow, water withdrawals, traffic, noise, and habitat.
- Zoning & buffers: Confirm the district where mixed-light cultivation is allowed and the sensitive-use buffer rules (often 600 ft baseline in California, but local governments set distances and measurement methods—property-line, entrance-to-entrance, parcel centroid). Get the method in writing from the Authority Having Jurisdiction (AHJ). Amazon
- CEQA & local review: The Department of Cannabis Control (DCC) requires CEQA compliance for annual licenses; local discretionary permits often produce the CEQA document. Expect conditions on lighting (shielding/curfews), odor, water, traffic, and biological resources. CEQAnet
- Water Boards: Enroll under the State Water Resources Control Board Cannabis Policy; plan forbearance periods, riparian setbacks, erosion control, and on-site storage sized to policy and site hydrology. GrowFlux
- Wildlife (CDFW): Channel work, culverts, or bank modifications may require a Lake and Streambed Alteration (LSA) Agreement. Start early. Americover
Build vs. buy (decision table)
Priority | Build new mixed-light | Acquire licensed greenhouse |
---|---|---|
Timeline | Slower (entitlements + CEQA + construction) | Faster (transfer/COO sequencing) |
Capex | Higher upfront; bespoke systems | Purchase premium, but lower build risk |
Control | Full control of curtain design, climate, workflow | Retrofit existing bays and controls |
Financing | Construction risk + 280E realities | Operating history supports underwriting |
If your calendar or capital structure favors speed, acquire and improve: tighten blackout, add Dehu, standardize SOPs, and train crews.
→ Evaluate operating cultivation/production businesses
→ Lease cannabis-ready greenhouses (bridge or expansion bays)
Due-diligence checklist
Regulatory & siting
- Zoning letter confirming use and measurement method for buffers (keep planner email).
- CEQA status and permit conditions (lighting shields, traffic, hours, odor plan). CEQAnet
- Water Boards enrollment; forbearance & storage plan; BMPs. GrowFlux
- CDFW LSA triggers (if any) and status. Americover
Facility & systems
- Curtain spec (single/double; interior/exterior); seal details at end-walls/gables.
- Drive type and automation controller; alarm logs; power-fail mode.
- Light-leak test results; lux sensor placement.
- Dehumidification and fan capacity; VPD monitoring. Ag & Natural Resources College
- Supplemental lighting (PPFD maps), DLI logging. DesignLightsPurdue Extension
Operations
- Curtain open/close SOP with sign-off; miss/exception log.
- Leak patrol checklist and CAPA trail.
- Feed vs. drain EC/pH records; runoff policy.
- IPM log (PM/Botrytis tickets; harvest-window compatibility).
Real estate
- Title, access, utility capacity; ALTA survey.
- Phase I ESA; drainage patterns; slope/erosion risks.
- Neighbor context (setbacks, prevailing winds, visibility).
Next steps and curated inventory
- Pick your calendar (2–3 seasonal deps) and write the blackout schedule into SOPs.
- Engineer climate at lights-out (Dehu + fans tied to curtains; VPD probes at canopy).
- Proof blackout (seal details, leak tests, lux sensors).
- Decide build vs. buy and act: